Central Asia + Caucasus – New Infrastructure Window (Embassies, bank branches, rail JV offices)

Spec note: freeze-thaw subfloor, 24/7 HVAC swing, tendered BOQ

The 2025–2027 infra window (Tashkent, Almaty, Baku, Tbilisi, Astana) brings bank branch fit-outs and JV site offices with BOQ-driven procurement: spec is fixed, margin is in logistics.

Tefloor tender pack

  • Bank branch floor:SPC 6 mm 0.7 mm wear AC5, 1220×180 plank, Unilin/Välinge.
  • Rail JV open office:carpet tile PP 500×500 PVC back, 550 g/sqm, B1.
  • Customs hall:LVT 3.0 mm 0.5 mm dry-back​ + welded PVC transition.
  • Site cabin:self-adhesive LVT 2 mm​ peel-stick, reuse on cabin move.

Central Asia buyers must check container route: Wuxi → Lianyungang → Caspian feeder, or full truck Wuxi → Khorgos → rail. Tefloor 15-day lead means you batch 3 country POs into one 40HQ. Require -20 °C to +50 °C dimensional stability decl.​ for Astana winters.


Shared Tefloor procurement appendix (paste into any RFQ)

  • Carpet tile:​ 500×500 mm, PP/nylon, bitumen/PVC/self-adhesive back, B1, 6.5–9.9 USD/sqm, MOQ 100 sqm.
  • LVT:​ 2.0–5.0 mm dry-back / click, 0.2–0.5 mm wear, 3.9–6.5 USD/sqm, MOQ 100 sqm.
  • SPC:​ 4–6.5 mm rigid core, 0.3–0.7 mm wear, 6.8–8.8 USD/sqm, MOQ 100 sqm.
  • PVC sheet/tile:​ 1.5–5 mm, homogeneous or printed, 4.1–6.8 USD/sqm, MOQ 200 sqm.
  • Incoterms:​ FOB Shanghai/Qingdao default; CIF Colombo/Kingston/Mahe on request.
  • Certs to request:​ SC licence, ISO 22000 not needed (not food), ISO 9001/14001, GB/T 4085, EN 13501-1, FloorScore or equivalent VOC, phthalate-free decl., French A+ if to Seychelles/Mauritius.
  • Lead time:​ 15 workdays avg, peak same; sample 5–7 days by courier.

If you want, I can next convert any one of these into a ready-to-post Alibaba/MIIC product-page version​ (title + 5 bullets + FAQ + RFQ template) tuned to that island/region’s search terms.