Introduction: Most Turf Dies in Year Two—Because of the Install

Walk past any apartment block with “fake grass” on the balcony and you’ll see the same story: edges curling, bald patches, a faint ammonia smell after rain. The turf itself isn’t necessarily bad. The installation was.

NetFloor artificial grass—manufactured by Wuxi Fuxing and exported by Changzhou Qiode—is engineered for an 8–10 year service life. But that lifespan is only as good as the substrate, the jointing, and the first 30 days of care.

This guide walks through the exact process Fuxing recommends for every NetFloor turf installation, whether it’s a 15 m² balcony or a 1,500 m² hotel courtyard.


Part 1: Substrate Preparation (The Foundation)

The single biggest mistake contractors make is rushing substrate prep. Turf conforms to whatever is underneath it. Bumps, cracks, and soft spots will telegraph through within weeks.

For Concrete Substrates (Balconies, Rooftops, Courtyards):

  1. Clean:​ Pressure-wash the surface. Remove all loose debris, oil stains, and old adhesive residues.
  2. Repair:​ Fill cracks wider than 3 mm with flexible polyurethane sealant. Turf will not hide structural cracks.
  3. Slope Check:​ Ensure minimum 1–2% slope for drainage. Standing water under turf = odor and mold.
  4. Dry Time:​ Allow sealant to cure 24 hours minimum.

For Soil/Subgrade (Gardens, Playgrounds, Gateball Courts):

  1. Excavate:​ Remove top 100–150 mm of organic soil. This layer holds moisture and will rot under turf.
  2. Base Layer:​ Fill with 100 mm crushed stone (10–20 mm aggregate), compacted in two layers.
  3. Fine Layer:​ Top with 20–30 mm sharp sand, leveled and compacted.
  4. Weed Barrier:​ Lay geotextile fabric over the entire area. Prevents weed growth through seams.

For Wooden Decks:

  1. Gap Check:​ Decking gaps must be < 5 mm or turf will sag. Add plywood underlayment if needed.
  2. Ventilation:​ Ensure air flow underneath. Trapped moisture + PU backing = premature degradation.

Part 2: Laying and Jointing

Step 1: Acclimatize

Roll out turf in the installation area 24 hours before cutting. This allows the backing to relax and prevents post-install shrinkage.

Step 2: Orient the Pile

Run your hand across the turf. One direction feels smooth, the other rough. Always lay all rolls with the smooth direction pointing toward the primary viewing angle​ (e.g., from the entrance toward the courtyard).

For multi-roll installations, alternate roll direction every other row to create a subtle stripe effect—or keep all same-direction for a seamless monolithic look. Decide before you cut.

Step 3: Cut to Fit

  • Use a sharp utility knife with a fresh blade (change every 3–5 cuts).
  • Cut from the back​ of the turf, following the backing grid.
  • For curved edges (around planters, columns), use a cardboard template first.

Step 4: Jointing

  • Lay adjacent rolls with a 3–5 mm gap between edges.
  • Place 4×25 cm joint tape​ (adhesive side up) under the seam.
  • Fold turf edges back onto the tape, press firmly.
  • Never use hot glue​ on leisure or landscape turf—it creates a rigid line that cracks with thermal movement.

Step 5: Secure the Perimeter

  • Fix edges with 6 mm galvanized nails or turf staples​ every 150 mm.
  • For concrete: use polyurethane construction adhesive​ in a 10 mm bead along the perimeter.
  • Cover nails with a thin line of matching silica sand.

Part 3: Infill Application (When Required)

ApplicationInfill TypeAmount
Balcony (residential)None or light silica0–0.5 kg/m²
Commercial courtyardSilica sand0.5–1.0 kg/m²
Sports / GateballSilica + optional SBR granule1.0–2.0 kg/m²
Playground (with pad)None (pad provides cushion)0

How to Apply:

  1. Spread infill evenly using a drop spreader.
  2. Brush into the pile with a stiff broom (against pile direction first, then with it).
  3. Repeat brushing after 48 hours as infill settles.

Part 4: The Maintenance Schedule That Gives You 10 Years

FrequencyTaskTool
WeeklyRemove leaves/debrisLeaf blower or soft broom
MonthlyBrush pile against directionStiff broom or mechanical brush
QuarterlyRinse with waterGarden hose (no pressure washer)
Bi-AnnuallyCheck seams and edgesVisual inspection
AnnuallyDeep clean + re-spread infillProfessional turf cleaning service
Year 3 / Year 7Professional deep extractionHot water + mild detergent

What NOT to Do:

  • ❌ Pressure wash (damages backing, forces water into substrate)
  • ❌ Use bleach or ammonia (degrades PU coating)
  • ❌ Park hot BBQ grills on turf (melts yarn)
  • ❌ Let construction debris sit on turf during nearby works

Conclusion: The Install Is Half the Product

A NetFloor 30 mm PU turf from Fuxing’s production line is a 10-year product—but only if the installation respects the substrate, the joints, and the first 30 days of care. Qiode’s export team includes these instructions with every shipment.

Request the full NetFloor Installation Manual (PDF, 12 pages, illustrated) from Changzhou Qiode.


Primary Keywords:​ artificial grass installation guide, how to install artificial grass, NetFloor turf maintenance

Secondary Keywords:​ artificial grass jointing tape, PU backing turf installation, balcony turf install steps, artificial grass infill guide